Active Blogs | Popular Blogs | Recent Blogs The mixing, paving and spreading are three major programs of mechanization construction in the construction and heavy repair of pug mill high-grade highway. The production of finish material and mixing quality of asphalt mixing plant known as mixing plant are an important factor to decide the progress and quality of engineer. What's more, the selection of the site of pug mills also directly affects the economic benefits of construction organization. So in the process of electing the site of asphalt mixing plant, the following points should be noticed:
1. The principle of choosing site of proper site, reasonable layout and low expense should be followed, in the process of site selection. As the large mixing plant has large floor area, many kinds of device, and the pile of aggregated rock must have some storage, therefore, one should consider the following factors while specifically conducting selection of the site of pug mill mixer: the selection of suppliers of raw materials, land tenancy fee, convenient transportation of raw materials and finish materials access to the mixing plant, convenient source of water and electricity, high terrain of site, dry environment and low groundwater level.
2. In the process of site selection, the building construction cost and the transport charge should be considered, so does the source of aggregated rock. There are two ways to choose the site of mixing plant: one is that supply finish materials for a tender. In this situation, the sit of mixing plant can be chosen to be near the roadbed of such tender and around the middle of the tender. But take note that the aggregated rock plant is only chosen to sit near the median vertical line and stand nearest to the mixing plant; if the aggregated rock plant has already been chosen, then the relative position of such aggregated rock plant and construction tender must be considered. If the aggregated rock plant is near one of the endpoints of the construction tender, then the mixing plant should be sited nearby such endpoint; if it isn't near the neither endpoints, the mixing plant should be sited nearest to the aggregated rock plant and near the road of the tender. It's a good choice because that the transportation charge is the lowest when the aggregated rock conveyed to the same direction or the two sides of the mixing plant during the process of moving aggregated rock to mixing plant and then move finish materials to construction site from the mixing plant; the other is that supply the finish materials for several pavements, it's best to set the mixing plant at the nearest place at this time. In this situation, the transportation of conveying aggregated rock is more convenient, and nearer to train station or storage while using nonlocal or import asphalt.
3. Mixing plant is the nucleus of clay pug mill construction. Whether it can be normally produced will cause indefinite affection to the progress of DJ pug mill program. Therefore, in order to ensure the mixing plant function well, it's of great importance to well deal with the preparatory work of early stage and external relationship.
After selecting the site of asphalt mixing plant, one should connect with the local land administration and electric power sector to transact the related formalities of SJ pug mill
temporary land-use and power utilization, and sign contracts for land leasing and using electricity.
Measure land and pile drive with land administration, organize labor power and mechanical equipment to make enclosure, level the ground, clear green crops and trees.
Negotiate the site and method of high voltage access to the mixing plant with the electric power sector, and sign construction contract of power distribution.